# Boulevard Point, Downtown Dubai: apartment prices, rents by bedroom and floor plans

> Boulevard Point is a finished Downtown Dubai apartment tower registered to EMAAR DEVELOPMENT P.J.S.C., where 34 qualifying ready-flat sales had a median price of AED 2,819 per sq ft in the 12 months to 11 November 2026 (Dubai Land Department). New one-bedroom contracts had a median annual rent of AED 125,000 across 49 contracts starting in the 12 months to 12 November 2026 (DLD).

Source: https://withlida.com/projects/boulevard-point

---

DLD records to 11 November 2026

- Developer: Emaar Properties
- Area: Downtown Dubai
- Status: Ready
- Homes: 359
- Architectural height: 279.8 m (Council on Vertical Urbanism, checked 26 November 2026)
- Median sale: AED 2,819 / sq ft

## What changed, November 2026

- The DLD registered two ready-flat sales in Boulevard Point in October 2026.

## 1. What is Boulevard Point?

Boulevard Point is a finished apartment tower on Sheikh Mohammed bin Rashid Boulevard in Downtown Dubai. Dubai Land Department (DLD) sales in the 12 months to 11 November 2026 put a ready one-bedroom flat at a median AED 2.25 million across 14 qualifying sales.

The distinction between the price of the flat and the price of its space matters here. The DLD recorded a median of AED 4.25 million across 13 qualifying ready two-bedroom sales in the year to 11 November 2026. That gives you the size of the purchase in dirhams. The price per square foot lets you compare homes of different sizes, even when they sit in the same tower. The bedroom table below gives both measures alongside the lowest and highest sums registered.

For a tenant, the more useful comparison is between a newly signed tenancy and an existing tenant’s renewal. Among one-bedroom flats, the middle new rent was lower than the middle renewal rent in the DLD contracts starting in the year to 12 November 2026. For the larger flats with enough contracts to compare, the order was reversed. Each group contains different homes and tenants. You can see how many contracts support each amount in the rent table.

- Apartments: 359 (Council on Vertical Urbanism, building profile checked 26 November 2026.)
- Registered completion: 17 Dec 2019 (DLD project register, 1 November 2026.)
- New one-bedroom rent: AED 125,000/year (49 contracts. DLD rent contracts starting in the 12 months to 12 November 2026.)

## 2. Where is Boulevard Point in Downtown Dubai?

Boulevard Point stands beside the Dubai Mall extension on Sheikh Mohammed bin Rashid Boulevard. Burj Khalifa / Dubai Mall is the nearest metro station in OpenStreetMap’s data to 15 November 2026.

The mall and the metro share a name but are in different places. The mall pin is just north of the tower, while the station is across Downtown to the northwest. When someone gives you a distance to “Dubai Mall”, the entrance they have in mind makes a difference. The map starts at the apartment building itself and gives the mall and the station their own destinations. The route to the neighbourhood pin is simply a drive within Downtown.

For travel beyond the boulevard, the map follows roads from the tower to the financial centre, Dubai Marina and Dubai International Airport. There is also a route to Hartland International School. These are drives to specific mapped points. They leave out traffic, time spent finding parking and the walk from a drop-off to your destination. The airport pin represents the airport as a whole. A journey to your departure terminal can take a different route from the one drawn here.

**From Boulevard Point**

- Boulevard Point (building)
- GEMS Wellington Primary School (school): School site as mapped by OpenStreetMap.

| From Boulevard Point | By car | Distance |
| --- | --- | --- |
| The Dubai Mall | 5 min | 2.4 km |
| Burj Khalifa / Dubai Mall | 5 min | 4.5 km |
| Hartland International School | 8 min | 5.7 km |
| Dubai International Financial Centre | 5 min | 3.7 km |
| Dubai International Airport | 23 min | 16.3 km |
| Dubai Marina | 19 min | 23.5 km |
| Downtown Dubai | 3 min | 1 km |

Positions and drives: OpenStreetMap (© OpenStreetMap contributors), by car without traffic, data to 15 November 2026. Choose a destination to follow its road route.

## 3. When was Boulevard Point completed?

The DLD project register dated 1 November 2026 gives 17 December 2019 as Boulevard Point’s completion date and marks construction 100% complete. The register does not establish when an individual owner received the keys.

The project dates answer different questions. The DLD’s start date belongs to the building project. The public sales launch came later, when Emaar described the new tower and its proposed bridge to the mall in a launch announcement reported by The National on 19 January 2014. A buyer looking back at an original purchase can therefore encounter a construction date, a launch announcement and a sale registration, each referring to a different event.

The planned end date also remains on the DLD entry after a building is finished. It records what was scheduled. The separate completion field is the one that records the finished work. The date of the register extract tells you when that information was available, rather than when an inspector visited the site. If the question concerns possession of a particular flat, the document that connects the home to its owner is a dated handover notice. The timeline below keeps the public milestones in date order and identifies the planned date as such.

- 8 January 2013: Registered project start (DLD project register, 1 November 2026.)
- January 2014: Public sales launch (Emaar announcement reported by The National, 19 January 2014.)
- 17 December 2019: Registered completion (DLD project register, 1 November 2026.)
- 10 February 2020: Planned end in the project file (DLD project register, 1 November 2026. This was the scheduled date.)

## 4. Boulevard Point registered sales by year

The DLD recorded 921 Boulevard Point sales from April 2014 to 11 November 2026. All 35 sales registered in the 12 months to 11 November 2026 were ready flats, according to the DLD.

The first year in the chart covers the launch period. All 329 sales in 2014 were off-plan registrations, according to the DLD sales register. They record purchases made under the procedure for a home sold before completion. The early bars show the take-up of that kind of purchase. Later bars include transfers of completed flats, and a flat can change hands more than once over the life of the tower.

The changeover is visible in a single calendar year. In 2020 the DLD recorded 12 off-plan registrations and 31 ready sales at Boulevard Point. A transaction’s registration type is a better guide to which group it belongs in than the calendar year or the tower’s present status. The last bar covers only the months for which the DLD has supplied data. The rolling annual total in the opening answer also includes sales from the end of the previous calendar year, which is why it differs from that final bar.

**Registered sales by calendar year** (homes)

|  | Registered sales by calendar year |
| --- | --- |
| 2014 | 329 |
| 2015 | 82 |
| 2016 | 11 |
| 2017 | 31 |
| 2018 | 16 |
| 2019 | 69 |
| 2020 | 43 |
| 2021 | 55 |
| 2022 | 60 |
| 2023 | 65 |
| 2024 | 63 |
| 2025 | 67 |
| 2026 so far | 30 |

Each column counts DLD registrations in that year. The 2026 column ends on 11 November.

**Ready and off-plan flat prices by year** (AED / sq ft)

|  | Ready | Off-plan |
| --- | --- | --- |
| 2020 | 1541 | 1773 |

DLD sales from 2014 to 11 November 2026. Each point is a calendar-year median in AED per sq ft for its registration type. The final year is partial.

## 5. What does a Boulevard Point apartment cost?

In the 12 months to 11 November 2026, the DLD recorded ready one-bedroom sales from AED 2 million to AED 2.95 million and two-bedroom sales from AED 3.1 million to AED 5.7 million among flats qualifying for price comparisons. The table gives the number behind each range.

A bedroom count narrows the comparison, but leaves room for a substantial difference in size. The home at the top of a price band need not have the highest price per square foot. The full purchase price measures what changed hands for the whole flat. The price per square foot measures each sale against its own registered area before the middle observation is taken. For the larger layouts the records are few enough that the actual endpoints tell you more than a single middle figure.

The surrounding area offers another way to read the tower’s prices. In the 12 months to 11 November 2026 the DLD ready-flat median was AED 2,480 per sq ft across 1,404 qualifying sales in the Burj Khalifa area, against AED 1,403 across 33,489 in Dubai as a whole. Nearby Burj Views and Burj Royale sit on either side of Boulevard Point in the comparison table. Each building contributed a different mix of sizes and layouts. The table compares the flats that traded during the same period.

| Bedrooms | Qualifying ready sales | Price range (AED) | Median (AED) | Median (AED/sq ft) |
| --- | --- | --- | --- | --- |
| 1 | 14 | 2,000,000 to 2,950,000 | 2,250,000 | 2,528 |
| 2 | 13 | 3,100,000 to 5,700,000 | 4,250,000 | 2,791 |
| 3 | 5 | 6,900,000 to 8,500,000 | Too few | Too few |
| 5+ | 2 | 20,000,000 to 24,000,000 | Too few | Too few |

DLD sales register, 12 months to 11 November 2026. Ranges run from the lowest to the highest qualifying whole-flat price.

| Ready flats | Sales used | Median (AED/sq ft) |
| --- | --- | --- |
| Dubai | 33,489 | 1,403 |
| Burj Views | 43 | 1,782 |
| Burj Khalifa | 1,404 | 2,480 |
| Boulevard Point | 34 | 2,819 |
| Burj Royale | 43 | 3,234 |

DLD sales register, 12 months to 11 November 2026. Burj Khalifa here means the DLD area around the tower.

## 6. Boulevard Point floor plans and apartment sizes

Emaar’s project page, checked on 26 November 2026, describes one-, two- and three-bedroom floor plans. The DLD also records larger ready flats, including two sales in its five-or-more-bedroom category in the year to 11 November 2026.

A bedroom label leaves out much of what you see on a floor plan. Two flats can have the same bedroom count and different living room proportions, balcony layouts and circulation space. The registered areas in the table let you place a plan within the spread of sizes that changed hands. They give the area attached to each sale. They do not give the internal dimensions of any room or identify which way a particular apartment faces.

The upper end of the range deserves its own line. The DLD groups its largest bedroom counts together, so a flat in the last row cannot be assigned an exact number of bedrooms from that label alone. The rows also describe transactions, which leaves out homes that did not change hands during the period. For a particular flat, the identifying details on its plan connect the layout to the unit. Emaar’s published floor plans and the building’s overall apartment count answer different questions from this sample of recent sales.

| Bedrooms | Sales used | Smallest (sq ft) | Largest (sq ft) |
| --- | --- | --- | --- |
| 1 | 14 | 773 | 996 |
| 2 | 13 | 1,332 | 2,001 |
| 3 | 5 | 1,821 | 2,360 |
| 5+ | 2 | 4,044 | 7,047 |

DLD sales register, 12 months to 11 November 2026. Registered areas of the ready flats in the price table, rounded to the nearest square foot.

## 7. What is the registered rent by bedroom?

In the 12 months to 12 November 2026, 49 new one-bedroom tenancies at Boulevard Point started at a median AED 125,000 a year, according to DLD rent contracts. The DLD median for 35 one-bedroom renewals starting in that period was AED 135,000 a year.

For a move into the building, the new-contract column is the closest match to the question “What did someone agree to pay when they moved in?” A renewal records a tenant continuing a tenancy. These figures use the annual amount on the contract, which lets you read the table in dirhams per year even when you are thinking about a monthly budget. The amount does not show how many payments the landlord and tenant agreed to make.

There is a different pattern among the larger flats. The DLD median for 28 new three-bedroom contracts was AED 370,498 a year, compared with AED 312,500 across 22 renewals in the year to 12 November 2026. That difference describes separate groups of contracts. Following the same home from an old agreement to a new one would take a different calculation. The table keeps the counts beside the rents so you can also see where a bedroom group has too few agreements to quote a middle rent.

| Bedrooms | New contracts | New median (AED/year) | Renewals | Renewal median (AED/year) |
| --- | --- | --- | --- | --- |
| 1 | 49 | 125,000 | 35 | 135,000 |
| 2 | 36 | 230,000 | 18 | 224,000 |
| 3 | 28 | 370,498 | 22 | 312,500 |
| 4 | 0 | No contracts | 1 | Too few |

DLD rent contracts starting in the 12 months to 12 November 2026. Each median uses contracts bearing the project number.

## 8. What are the service charges and parking arrangements?

The DLD’s public Service Charge Index listed Boulevard Point on 26 November 2026, but the approved rate could not be verified. Parking was marked on all 35 ready-flat sales registered by the DLD in the 12 months to 11 November 2026.

A service charge covers the running of shared parts of a building. Emaar Community Management lists a gym, a swimming pool, a children’s pool and an outdoor play area here. Those facilities help explain the distinction between the shared building and the space inside your flat. The list of amenities does not give a cost for maintaining them, and a sale price per square foot measures something quite different from an annual service charge per square foot.

The index entry is filed under Boulevard Point in Downtown Dubai. The public form asks for the property use and budget year for your chosen project. The title-deed search identifies a particular property. Parking has a narrower meaning in the sales data. A marked field tells you that parking formed part of the registration. The sale entry does not give the bay number, show where it sits in relation to the lift or set a separate price for it. The recent sale entries all describe flats and cannot establish the number of shops in the building.

- [Service Charge Index](https://dubailand.gov.ae/en/eservices/service-charge-index-overview/): Look up Boulevard Point in Downtown Dubai by property use and budget year. Checked 26 November 2026

## 9. Who developed Boulevard Point?

The DLD project register of 1 November 2026 names EMAAR DEVELOPMENT P.J.S.C. as developer and EMAAR PROPERTIES (P.J.S.C) as master developer. The roles appear on the same entry for Boulevard Point.

If you know the tower from Emaar’s floor plans, the shorter name on the brochure will be familiar. In a project search the company name is more specific. The developer field identifies the company to which the tower is registered. The master developer field places the building within the wider development. It is possible to follow the Emaar name around the neighbourhood and still be looking at a different project or a different registered company.

For context, the DLD project register of 1 November 2026 lists 58 finished projects and 44 active projects under developer number 1211, the company number on Boulevard Point. The figures describe that legal company’s entries at the date of the register. They cover multiple locations and give no count of the homes in any particular tower. The linked developer record covers Emaar more broadly. The Downtown Dubai record is the companion page for someone comparing the location with other residential buildings around the boulevard.

- [Emaar](/developers/emaar): Registered projects and completion history across the developer’s portfolio. Developer record
- [Downtown Dubai](/areas/downtown-dubai): Apartment sales and rents in the surrounding neighbourhood. Area record

## 10. How can you check Boulevard Point with the DLD?

Use Project Status Enquiry to look up Boulevard Point by name or by project number 1405, as listed in the DLD project register of 1 November 2026. The DLD keeps the approved service-charge lookup in a separate service.

In the project search, the name and the area together identify the right building. Boulevard Point and Boulevard Central are distinct developments in the same neighbourhood. Once you have the Boulevard Point entry, the developer field identifies the company and the completion field gives the date recorded for the project. The escrow field concerns the bank named for the project account. The DLD project register of 1 November 2026 names Mashreq Bank for Boulevard Point. That entry identifies the bank attached to the development.

For a price check, the Real Estate Data page separates transactions from rents. Within transactions, the registration type distinguishes a ready sale from an off-plan purchase. For rent contracts, the annual amount and the contract start date are the fields that correspond to the rent table here. For the recurring building charge, the Service Charge Index asks for the use and budget year. The relevant document for an individual owner is the charge statement for that home and period.

- [Project Status Enquiry](https://dubailand.gov.ae/en/eservices/real-estate-project-status-landing/real-estate-project-status): Search for the tower by its registered name or project number. Checked 26 November 2026
- [Real Estate Data](https://dubailand.gov.ae/en/open-data/real-estate-data/): Select transactions, projects or rent contracts. Checked 26 November 2026

## 11. Questions about Boulevard Point

How many floors does Boulevard Point have? As checked on 26 November 2026, Emaar Community Management says 63 storeys, Emaar’s project page says 68, and the Council on Vertical Urbanism counts 69 above-ground floors.

For someone trying to place a flat within the building, the floor convention matters. The Council includes the ground floor, significant mezzanines and main mechanical floors in its above-ground figure. Emaar’s public descriptions do not give a reconciliation between their totals. A lift label or a floor printed on an apartment plan identifies where that apartment sits in the building’s own numbering system. Using a structural floor count to infer a unit number would go beyond what the sources say.

Another common question concerns the view. Emaar describes views towards the Old Town and Downtown Dubai. That is a description of the building’s setting. The relevant detail for a specific apartment is its orientation, something the bedroom label and the registered selling price cannot tell you. The same applies if you are comparing photographs from different flats in the tower. A floor plan with its orientation and unit reference is what lets you connect a particular photograph or view with the apartment it describes.

**How tall is Boulevard Point?**

The Council on Vertical Urbanism gives an architectural height of 279.8 metres in its building profile, checked on 26 November 2026.

**Where can you find Boulevard Point floor plans?**

Emaar’s Boulevard Point project page has a floor plans tab. Match the layout to the reference for the flat you are looking at.

**What facilities does Boulevard Point have?**

Emaar Community Management lists a gym, swimming pool, children’s pool and outdoor play area in its building guide, checked on 26 November 2026.

## 12. How this record is made

The sales count matches Boulevard Point in the DLD area Burj Khalifa through 11 November 2026. The rent count uses tenancies carrying Boulevard Point’s project number in DLD contracts starting through 12 November 2026.

The DLD files the same sales under the building name and the project name. Matching the project within its registered area counts each sale once. All sales with a valid date enter the count. To measure a ready flat’s price per square foot, the calculation uses residential flat sales whose registered price and area pass the quality checks. Each qualifying sale has equal weight in the median. Ready and off-plan prices have separate series throughout the building’s history.

The rents use Ejari, Dubai’s tenancy registration system. Only single-home residential flat contracts with an annual amount of at least AED 5,000 enter this calculation, using the DLD rent extract to 12 November 2026. Contracts that carry no project number cannot be assigned to this tower. A median needs at least ten qualifying transactions or contracts under the method applied to the November 2026 DLD extracts. OpenStreetMap contributors supply the positions and road network. The building details come from the project register, Emaar and the Council on Vertical Urbanism.

- [Dubai Land Department](https://dubailand.gov.ae/en/open-data/real-estate-data/): Transactions, rent contracts and project data under the Dubai Open Data Licence. Checked 26 November 2026
- [Boulevard Point floor plans](https://www.emaar.com/en/properties/boulevard-point): Emaar’s apartment types and building description. Checked 26 November 2026
- [Boulevard Point residents’ guide](https://www.ecm.ae/en/communities/downtown-dubai/residences/boulevard-point/): Facilities and Emaar Community Management’s floor count. Checked 26 November 2026
- [The Skyscraper Center](https://www.skyscrapercenter.com/building/boulevard-point/16234): The Council on Vertical Urbanism’s apartment, floor and height figures. Checked 26 November 2026
- [Boulevard Point at launch](https://www.thenationalnews.com/business/property/emaar-launches-apartments-linked-to-the-dubai-mall-1.603940): The National reported Emaar’s announcement and proposed mall link. 19 January 2014

Before you act, verify current property details and charges with the Dubai Land Department or a licensed professional. This record is general information, not financial, legal or investment advice.

2026-11-26 · published · First record of Boulevard Point sales, rents and building details. Sources accessed 26 November 2026.
